TRANE
R
Installation
8
Erection
To minimize noise transmission,
insulation material such as cork
slabbing (TICO pads) or rubber pad
may be placed between the unit base
and the foundation (see Figure 8).
Figure 8 - Air Handling Unit Plinth Foundation
IMPORTANT
!
FAILURE TO PROVIDE A LEVEL
PLINTH OR SUPPORT WILL
RESULT IN DOORS JAMMING
AND AIR LEAKS FROM THE
CASING.