EasyManua.ls Logo

Trane RTXC XE Series - Rigging Procedures and Safety

Trane RTXC XE Series
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
Rigging
Refer to lifting instruction label on the unit, a specific lifting method is recommended as follow:
1. The equipment should be moved by lifting. Do not use forklift truck to move or lift the unit.
2. The cables, chains, slings and lifting beam crossbars must be provided by crane operator and attached on
the lifting points. As Figure 4 RTXC XE Rigging, Table 2 Unit lifting weights and center of gravity dimensions.
NOTICE - Fin-tube coil damage!
Use properly sized lifting beam crossbars to avoid crushing fin-tube coils of the unit with lifting
chains.
3. Each of the cables, chains or slings used to lift the unit must be capable of supporting the entire weight of the
unit. See Table 2.
4. keep cables or chains clear of unit sides. As further protection, plywood sheets may be placed against sides
of unit, behind cables or chains.
5. After test lift unit at minimal height to verify even level lift, raise and set unit down carefully. Avoid shocks or
rolling while handling.
6. Remove the lifting tools after the unit on place.
NOTICE - Alignment and Spacing between Master and Slave Units!
Keep units level and aligned and gurantee 300mm distance on the length direction between master
and slave unit of 310/330/360/400/440XE.
Figure 4- 1 Rigging - RTXC110XE

Related product manuals