EasyManua.ls Logo

Trane S9V2B040U3PSBB - Page 55

Trane S9V2B040U3PSBB
108 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
18-CE01D1-1M-EN
55
Table 4. Return Duct Connections (continued)
Downflow Furnace with Top Return and Plenum with Filter Box
1. Remove the top plate.
2. Attach the filter box to the top of the furnace.
3. Attach ducting.
4. Seal per local codes and requirements.
Filter
FFuurrnnaaccee GGeenneerraall IInnssttaallllaattiioonn

Related product manuals