EasyManua.ls Logo

Trane S9V2B060U3VSAD User Manual

Trane S9V2B060U3VSAD
120 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SSAAFFEETTYY WWAARRNNIINNGG
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning
equipment can be hazardous and requires specific knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person
could result in death or serious injury. When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that
are attached to the equipment.
December 2022
SS99VV22--VVSS--SSVVXX000011--11BB--EENN
Upflow/Horizontal and Dedicated Downflow
Gas-Fired, Direct/Non-Direct Vent, 2-Stage
Condensing Variable Speed Furnaces with Variable Speed
Draft Inducer
UUppffllooww,, CCoonnvveerrttiibbllee ttoo
HHoorriizzoonnttaall RRiigghhtt oorr
HHoorriizzoonnttaall LLeefftt
S9V2B040U3VSAE
S9V2B060U3VSAC/D
S9V2B080U4VSAC/D
S9V2C100U4VSAC/D
S9V2D120U5VSAC/D
DDoowwnnffllooww OOnnllyy
S9V2B080D4VSAC/D
S9V2C100D4VSAC/D
NNoottee:: Graphics in this document are for representation
only. Actual model may differ in appearance.
CAUTION
!
Failure to follow this Caution could result in property damage or personal injury. 4GXC* and
4MXC* coils installed on upflow furnaces in vertical, horizontal left, or horizontal right
orientations without a factory installed metal drain pan shield must use a MAY*FERCOLKITAA
kit. Coils installed on upflow furnaces must have drain pans that are suitable for 400° F
(205°C) or have a metal drain pan shield. Downflow furnaces do not require a metal drain pan
shield or the use of the MAY*FERCOLKITAA kit.
COIL REQUIREMENT!
S9V2-VS-SVX001-1B-EN
Installation, Operation, and Maintenance
Question and Answer IconNeed help?

Do you have a question about the Trane S9V2B060U3VSAD and is the answer not in the manual?

Trane S9V2B060U3VSAD Specifications

General IconGeneral
ModelS9V2B060U3VSAD
TypeGas Furnace
Efficiency RatingHigh Efficiency
Heating Capacity60, 000 BTU/h
Input BTU/h60, 000 BTU/h
Ignition TypeHot Surface Ignition
Maximum External Static Pressure0.8 in. W.C.
BrandTrane
CategoryFurnace
Stages2-Stage
Blower TypeVariable Speed
Motor TypeECM Motor
Warranty10 Years Limited
Gas TypeNatural Gas
Voltage120V

Summary

Installation, Operation, and Maintenance

Product Overview and Coil Requirements

Describes furnace types and specific coil installation requirements.

Safety Section — Furnaces

General Safety Warnings

Covers fire, explosion, electrical shock, and carbon monoxide hazards.

Furnace Installation Guidelines

Safety Practices and Precautions

Essential safety practices for installation, servicing, and operation.

Furnace General Installation

Gas Piping and Combustion Checks

Instructions for gas piping connection and combustion/input rate checks.

General Start-up and Adjustment

Preliminary Inspections and Lighting

Pre-operation checks, startup sequence, and safety warnings.

Integrated Furnace Control Menu

Troubleshooting

Error Codes and IFC Layout

Explanation of error codes and diagram of IFC components.

Fault Code Troubleshooting

Flowcharts for diagnosing and resolving various furnace fault codes.

Sequence of Operation

Periodic Servicing Requirements

Related product manuals