EasyManua.ls Logo

Trane SFHJ090-162 - Page 57

Trane SFHJ090-162
200 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
RT-SVX24J-EN 57
Figure 35. (3) Side and top filler panel removal/(4) high side installation preparation
Filler panel
shipping position
Top cover
shipping position
Filler panel
shipping position
Note: Remove the filler panels and top cover before putting the
Indoor and Outdoor sections together and screw to both Indoor
and Outdoor panels on each side as shown in fig (6). Finally the
top cover is assembled in space.
(3)
Unconnected tubes
(4)

Table of Contents

Related product manuals