EasyManua.ls Logo

Trane TAM4A0C60S51SB User Manual

Trane TAM4A0C60S51SB
251 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Trane TAM4A0C60S51SB and is the answer not in the manual?

Trane TAM4A0C60S51SB Specifications

General IconGeneral
ModelTAM4A0C60S51SB
TypeAir Handler
Cooling Capacity5 tons
RefrigerantR-410A
Nominal CFM2000
Voltage208/230V
Phase1
Heating Capacity60, 000 BTU/h
InsulationFoil-faced

Summary

Trane Warnings, Cautions, and Notices

Safety Warnings and Precautions

Key warnings regarding safety, hazards, and required precautions for equipment operation.

Trane General Information

Field Wiring Requirements

Emphasizes critical safety and code compliance for field wiring installation and grounding.

Trane Installation - Mechanical

Lifting and Rigging

Covers safe procedures and considerations for lifting and rigging air handler units and sections.

Trane Component Installation Requirements

Seismic Isolation Requirements

Outlines requirements for seismic-compliant installation, including anchor specifications.

Trane Coil Piping and Connections

Trane Installation - Electrical

WARNING Proper Field Wiring and Grounding Required!

Emphasizes the necessity of qualified personnel for safe and compliant field wiring and grounding.

Trane Start-Up

Pre-Startup Checklist

A comprehensive checklist to complete before operating the unit for the first time.

Trane Troubleshooting

WARNING Hazardous Service Procedures!

Crucial safety warning about potential hazards during maintenance and troubleshooting.

Trane Routine Maintenance

Installer's Guide - Safety Information

Installer's Guide - Refrigerant Line Brazing

11.1 Braze The Refrigerant Lines

Provides step-by-step instructions for brazing refrigerant lines, including safety precautions.

Installer's Guide - Start Up

17.1 System Start Up

Details the system start-up sequence, including thermostat and power settings.

Installer's Guide - Checkout Procedures

19.1 Operational And Checkout Procedures

Provides a checklist for final system checks and operational verification.

WWT Cleaner CL83

Related product manuals