Method B: Unpacking for vertical landscape package: DE18M(II) / DE18M.08(II) / DEG18MC.20(II)
/ DEG18M.20(II) / DEG18M.28(II) / DE19 / DEG19C.20 / NEG19C.20 etc. series modules; and
DE20/DEG20C.20/DE21/DEG21C.20 only for China
Method C: Unpacking from one side for DE09 / DE09.05 / DE09.08 / DE09C.05 / DE09C.07 /
DEG9.20 / DEG9.28 / DEG9C.27 / NEG9.20 / NEG9.28 / NEG9C.27 etc. series modules with vertical
landscape package.
1) Remove the wrapping film
2) Remove the top cover and
3) Place the stand supporter
that is higher or wider than the
module in order to avoid
hitting and damaging the
glass.
4) Cut off all the horizontal
packing belts; when there are 1
or 2 vertical packing belts
remaining, push the module
gently to tilt toward the stand
supporter.
6) Take out the modules in
order.
1) Cut all the packing belts and
take out the wrapping film.
3) Remove the side cover.
4) Take out the modules from one side.