Vertical bar mixer shower
8
SUPPLY PIPE WORK
Complete the pipework to the shower area
having decided on the position of the shower
and direction of pipe entry (for example rising,
falling or rear entry)
The hot and cold water pipes should not
be permanently attached to the wall within
one metre of the valve, before installation is
complete, to allow for final adjustment of the
valve position.
The hot and cold water supply inlet centres of
the bracket are 60mm (approximately) apart
(fig.8).
WARNING!
Check there are no hidden cables or
pipes before drilling holes for wall
plugs. Use great care when using
power tools near water. The use of
a residual current device (RCD) is
recommended.
Fig.8
60mm

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Triton VALDI and is the answer not in the manual?

Triton VALDI Specifications

General IconGeneral
BrandTriton
ModelVALDI
CategoryPlumbing Product
LanguageEnglish

Related product manuals