EasyManua.ls Logo

Trojan CONCEPT 200 - Assembly Steps; Assembly of the Base Frame and Weight Stack

Trojan CONCEPT 200
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11485-6
4. ASSEMBLY STEPS
STEP 01 Assembly of the base frame and weight stack
s  *OIN44UBEAND(ORIZONTAL"EAMSECURINGTHEMWITHTWOvXv"OLTSFOURvXMM
Washer (66) and two 3/8” Nut (63).
Note: Two 3/8”x19mm Washer (66) and two 3/8” x 1” Bolt (59) have been attached on the
Guiding Tubes, so please separate them, then follow Step 1.2 to assemble.
s  3LIDEBOTH'UIDE4UBEINTOTHETWO2UBBER2INGSANDTHROUGHTHE(ORIZONTAL"EAMSECURE
them with two 3/8” x 19mm Washer (66) and two 3/8” x 1” Bolts (59).
s  0LACETHENINE7EIGHT3TACKONTOTHETWO'UIDING4UBES
s  )NSTALL"LACK&IXING"USHINGINTO3ELECTOR"AR,ET&IXING0INGOTHROUGHTHEHOLEOF"LACK&IXING
Bushing (74) and the first hole of Selector Bar (32), then attach to the bottom part in the hook of Top Plate
(30).
s  4HENPUT3ELECTOR"ARINTOTHE7EIGHT3TACK!TTACHTHE"LACK7ASHERONTHEMIDDLEHOLE
of Top Plate (30).
s  #ONNECTTHE2EVOLVING0ARTWITH44UBESECURETHEMWITHONEvXv"OLTANDONE
3/8” x 1” Washer (67).

Related product manuals