15
STEP 8: CABLE 35
Installing the pulley system:
1. Install Pulley (32)
A
onto the Upper Cross Beam (9) using 1 Hex Bolt (60), 2 Washers (67) and 1 Nylon Nut (70).
2. Once complete, install Pulley (32)
B
and 2 Pulley Hooks (55) (which are used to help thread the cable) onto the
Support Frame (8) using 1 Hex Bolt (59), 2 Washers (67) and 1 Nylon Nut (70).
3. Install Pulley (32)
C
and 2 Pulley Hooks (55) to the Pulley U (22) using 1 Hex Bolt (59), 2 Washers (67) and 1 Nylon
Nut (70).
4. Install Big Pulley (32)
D
(also indicated by a different colour or additional colour mark on it) and 2 Pulley Covers (54)
onto the Upper Cross Beam (9) using 1 Hex Bolt (59), 2 Washers (67) and 1 Nylon Nut (70).
5. Attach the bolt end of Cable 35 to the Selector Shaft (5) with Plastic Washer (26) by screwing it in.
Attach the ball end of Cable 35 to the Lat Bar (19) using 1 Pothook (29).
Threading the cable through the pulley system:
1. Thread Cable 35 through the groove of Pulley (32)
A
and then through the Upper Cross Beam (9).
2. Thread Cable 35 through the groove over Pulley (32)
B
.
3. Directly below Pulley (32)
B
loop Cable 35 under Pulley (32)
C
.
4. Directly above Pulley (32)
C
, loop Cable 35 over Pulley (32)
D
.
ASSEMBLY STEPS
37
Step 1 Step 2 Step 3
36
37
35
36
37
36
36
35
35
26
B
D
A
C
STEP 8
STEP-BY-STEP PROCESS FOR ATTACHING THE PULLEYS & THREADING CABLES
#19M02T008 Power Gym 1.0 UM VERSION 4.indd 15 29/05/2019 13:29