10 EN
garden pump TGP 1025 E
Bleeding the pressure line
Please observe the following information before bleeding or
switching the device on:
• Make sure that the mains connection corresponds to the
specifications provided in the technical data.
• Check the mains socket for its proper condition and
sufficient fusing.
• Make it impossible for moisture to reach mains plug or
socket. There is a risk of electric shock!
• Check whether the pressure and suction line were properly
attached.
• Check the set precharge pressure in the pressure tank. To
do so, follow the instructions on Checking the precharge
pressure in the pressure tank in the Maintenance chapter.
1. Open all consumers connected to the pressure line to
bleed the pressure line.
2. Switch on the device as described in the Operation chapter
and wait until the device has sucked in water or until water
flows out of the consumers.
Operation
Warning of electrical voltage
Do not touch the mains plug with wet or damp hands.
Switching the device on
1. Plug the mains plug into a sufficiently fused mains socket.
2. Switch the device on by setting the on/off switch(1) to
positionI.
ð The device is ready for operation and switches on as
soon as a pressure drop in the system – generally
caused by a consumer at the pressure line being
opened – results in a pressure below the switch-on
pressure of 1.5bar.
ð The device switches off when – after the consumer has
been closed – the pressure in the system rises again
and the switch-off pressure of 3bar is reached.
Shutdown
Warning of electrical voltage
Do not touch the mains plug with wet or damp hands.
Warning
The device is pressurized. Before opening the screw
plug at the water drain nozzle(5) or before
disassembling the pressure line, the pressure must be
released from the pressure line via the lowest-level
consumer.