TWIN BUSCH GmbH
Technical changes for purposes of a technical advancement as well as deviation in colour, errors and printing mistakes are reserved.
page 13 of 45
3.4 Check list after installation
Are the posts vertical? (90°)
Are both posts parallel to each other?
Are all oil connections correct?
Are the cables secure and tight?
Are the lifting arms correctly mounted?
Are all electrical connections correct?
Are all bolts, screws and joints secure?
Are all moving parts and cables lubricated?
4. Operation instructions
4.1 Safety checks
4.1.1 Check all connections for leaks, if no leaks are found the lifting process can begin.
4.1.2 If the safety devices are not working the lift may not be used.
4.1.3 When a vehicle is lifted it is very important that the weight is correctly balanced, the manufacture and dealers will
take no responsibility for any damage or injury caused by improper use.
4.1.4 Operators and other personnel must stand clear of the lift when in use. Personnel must stand in a designated safety
area.
4.1.5 When the lift has reached the desired height the power should be turned off to avoid tampering.
4.1.6 Make sure that all safety locks are engaged before working under the lift.
4.2 Descriptions of control box