EasyManua.ls Logo

twin busch TW 242 E - Concrete Floor Requirements

twin busch TW 242 E
45 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TWIN BUSCH GmbH
Technical changes for purposes of a technical advancement as well as deviation in colour, errors and printing mistakes are reserved.
page 23 of 45
Requirements for the concrete floor:
Concrete C20 / 25 according to DIN 1045-2 (Previously known as DIN 1045 concrete B25).
Horizontal, accuracy of flatness smaller than 5 mm (0.2”).
New concrete must dry for 28 days.
Foundation dimensions:
Ideally, it’s better to cover the whole area in concrete C20 / 25, 200 mm (up to 4 t)
or 250 mm thick (5 t).
Minimum requirments: 2-Post lift 4 t:
4 m x 3 m x 0,2 m
(13 ft. x 10 ft. x 8 in.)
alternativ H-form alternativ Block-form