EasyManua.ls Logo

Tyco DN40 - Appendix B of TFP1335 (12;2016) Summary Instructions (if Problems Occur, Consult Full Document) Deluge Valve, DV-5, DN40 Thru DN200, Dry Pilot Actuation

Tyco DN40
29 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
I. Normal conditions:
The Stop Valve (B) is opened and
locked
The Main Drain Valve (D) and System
Drain Valve (E) are closed
The Diaphragm Supply Valve (P),
Alarm Control Valve (H), and Dry Pilot
Air Supply Valve (T) are open
The Manual Control Station (M) and
Alarm Test Valve (G) are closed
Water Supply Gauge (J) reads the
upstream water pressure
The System Gauge (L) reads zero
The Diaphragm Gauge (K) is equal
to or greater than the Water Supply
Gauge (J)
The Dry Pilot Line Gauge (U) reads
dry pilot line pressure
II. Operation
When set for service, the DV-5 Dia-
phragm Chamber is pressurized from
the inlet side of the Stop Valve (B).
Opening of the Manual Control Station
(M) or the Dry Pilot Actuator (R) via
operation of a Dry Pilot Sprinkler (re
detection) releases water from the
Diaphragm Chamber faster than it can
be replenished through the Automatic
Shut-Off Valve (N). The water supply
pressure then forces the DV-5 Dia-
phragm open permitting water to flow
into the system piping, as well as to the
Waterow Switch (C).
III. Removing system from service:
Step 1. Close the Diaphragm Supply
Valve (P).
Step 2. Close the Stop Valve (B).
Step 3. Open the Main Drain Valve (D).
Step 4. Close the Dry Pilot Air Supply
Valve (T).
IV. Placing the system back in
service:
Step 1. Close the Stop Valve (B).
Step 2. Close the Diaphragm Supply
Valve (P) and the Dry Pilot Air Supply
Valve (T).
Step 3. Open the Main Drain Valve (D),
System Drain Valve (E), and all auxil-
iary drains in the system. Close the
System Drain Valve (E) and auxiliary
drain valves after water ceases to dis-
charge. Leave the Main Drain Valve (D)
open.
Step 4. Depress the plunger of the
Automatic Drain Valve (F) to verify that
it is open and that the DV-5 Valve is
completely drained.
Step 5. Clean the Diaphragm Supply
Strainer (Q).
Step 6. Reset the actuation system.
Manual Actuation — Push the operat-
ing lever up; however, do not close the
hinged cover at this time.
Dry Pilot Actuation — Replace oper-
ated pilot sprinklers, reset the remote
manual control stations, and open the
Dry Pilot Air Supply Valve (T) to re-
establish dry pilot air pressure as indi-
cated on the Dry Pilot Line Gauge (U)
per the graph.
Step 7. Open the Diaphragm Supply
Valve (P) to pressurize the DV-5 Dia-
phragm Chamber.
Step 8. Open and then close the
Manual Control Station (M) to vent
trapped air from the DV-5 Diaphragm
Chamber.
Step 9. Temporarily close the Dia-
phragm Supply Valve (P), and then
observe the Diaphragm Gauge (K) for
a drop in pressure.
If the Diaphragm Chamber Pressure
Gauge (K) indicates no drop in pres-
sure, re-open the Diaphragm Supply
Valve (P) and proceed to the next step.
Step 10. Partially open the Stop Valve
(B), close the Main Drain Valve (D), and
observe the Automatic Drain Valve (F)
for leaks. If there are no leaks, the DV-5
Valve is ready to be placed in service
and the Stop Valve must then be fully
opened.
V. Weekly test:
Important: Prior to closing any valves
or activating any alarms, notify local
security guards and the central alarm
station if applicable.
Step 1. Open the Alarm Test Valve (G),
verify that the alarm signal created by
the Waterflow Switch (C) is visible at
the fire panel. If applicable, check the
sound of the water motor alarm — it
must be clear and steady.
Step 2. Return the Alarm Test Valve (G)
to the normally closed position after
verifying that the alarm signal is visible
at the fire panel.
Step 3. Drain the alarm line by squeez-
ing the Automatic Drain Valve (F). If the
supply is below the normal, use the
instructions from the water supply to
obtain the usual pressure.
DV-5 Valve
Description
Waterow Switch
Main Drain Valve
System Drain Valve
Automatic Drain Valve
Diaphragm Gauge
Alarm Control Valve
Water Supply Gauge
Alarm Test Valve
Diaphragm Supply Valve
Automatic Shut-Off Valve
Manual Control Station
Dry Pilot Actuator
Dry Pilot Low Pressure Switch
Dry Pilot Air Supply Valve
Diaphragm Supply Strainer
System Gauge
Stop Valve
Diaphragm Supply Connection
Water Motor Alarm Connection
Pressure Relief Valve
Dry Pilot Air Supply Connection
Dry Pilot Line Connection
Dry Pilot Line Gauge
C
T
4
1
2
3
V
U
L
P
R
S
Q
N
M
G
K
H
J
F
D
E
Item
A
B
2
G
C
R
B
1
Q
E
H
J
A
3
M
N
V
S
L
4
T
U
K
P
F
D
WATER SUPPLY PRESSURE IN BAR
RANGE OF ACTUATOR OPENING PRESSURE
MINIMUM SYSTEM AIR PRESSURE
AIR PRESSURE IN BAR
1,0
1,0
0
2,0
3,0
4,0 7,0 10,0 13,0 16,0
Appendix B of TFP1335 (12/2016)
Summary Instructions (If problems occur, consult full document)
Deluge Valve, DV-5, DN40 thru DN200, Dry Pilot Actuation

Other manuals for Tyco DN40

Related product manuals