INSTALLATION GUIDE
PAGE
2
10-DEGREE BALLASTED RACKING SYSTEM
INTRODUCTION
Field Support Contact Information
Unirac proudly offers dedicated engineering expertise and superior customer support. For questions about the installation procedures or a specic application,
please contact our Field Support Specialists at 866-488-6794 or FieldSupport@Unirac.com.
Installer Responsibility
The installer is solely responsible for:
• Utilizing all necessary safety equipment, as required by applicable rules and regulations.
• Complying with all applicable local and national building codes, including any that may supersede this manual.
• Ensuring that Unirac® EcoFoot2+® and other products are appropriate for the specic installation and are designed for the installation environment.
• Ensuring that the roof, its rafters, connections, and other structural support members can support the array under all conditions.
• Maintaining the waterproof integrity of the roof including selection of appropriate ashing if the system is being installed using attachments.
• Ensuring safe installation of all electrical aspects of the entire system