EasyManuals Logo

Universal Robots CB Series Hardware Manual

Universal Robots CB Series
103 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #55 background imageLoading...
Page #55 background image
You can access the Service Manual (http://www.universal-robots.com/support) for more on how
to perform inspections.
Inspection action type Timeframe Monthly Biannually Annually
1 Check blue lids* V
2 Check flat rings V
3 Check robot cable V
4
Check robot cable
connection
V
V = Visual inspection * = Must also be checked after heavy collision
5.3.2. Robot Arm Visual Inspection
NOTICE
Using compressed air to clean the robot arm can damage the robot arm
components.
Never use compressed air to clean the robot arm.
1. Move the robot arm to the Zero position, if possible.
2. Turn off the robot and disconnect the power cable from the Control Box.
3. Inspect the cable between the Control Box and robot arm for any damage.
4. Check the base mounting bolts are properly tightenend.
5. Inspect the flat rings for wear and damage.
Replace the flat rings if they are worn or damaged.
Hardware Manual 55 UR5e
5.Maintenance and Repair
Copyright © 2009–2022 by UniversalRobotsA/S. All rights reserved.

Other manuals for Universal Robots CB Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Universal Robots CB Series and is the answer not in the manual?

Universal Robots CB Series Specifications

General IconGeneral
BrandUniversal Robots
ModelCB Series
CategoryRobotics
LanguageEnglish

Related product manuals