EasyManua.ls Logo

Upright SB60 - Page 105

Upright SB60
179 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Illustrated Parts Breakdown
Section
SB60 Work Platform 6-13
6.2
18
7
7
TORQUE LUG NUTS TO 140-170 FT LBS.
42
1
8
1
5
6
SET TIRE PRESSURE TO 80 PSI
BRAND TIRE WITH DATE SETUP & FIXTURE
ON ITEM 18 & 21 TURN FITTING
TOWARD THE CENTER OF THE FLANGE
6
5
4
3
2
1
26
28
2
3
GREASE FLANGE BEARING (ITEM 10).
ATTACH HOSE & TORQUE PRIOR TO INSTALLING.
COUPLER SUPPLIED WITH (ITEM 9) PLANETARY DRIVE.
INSTALL WITH SPLINED END OF COUPLER TOWARDS MOTOR
(TYPICAL 4 PLACES).
1
3
21
18
1112
5
23
7
9
10
17
2
4
1413
18
36 37 38
24
15
41
2 PLACES
TORQUE TO 190 FT/LBS
2
3435
3435
22
4
36 37 38
RUN FRONT DRIVE MOTOR
HOSES THRU ITEM 42;
USE 2-1/2 FT PER SIDE.
6
25
19
18
21
43
RUN AXLE LOCK CYL.
HOSES THRU ITEM 43;
USE 3 FT PER SIDE
4
30
16
31
44
NOTES:

Related product manuals