Do you have a question about the Upright ULII-25 and is the answer not in the manual?
Brand | Upright |
---|---|
Model | ULII-25 |
Category | Lifting Systems |
Language | English |
Instructions for preparing the lift for operation.
Procedures for safely shipping the machine by freight carrier.
Guidelines for normal and long-term storage of the lift.
Essential safety rules and precautions for operating the lift.
Identification and function of all controls and indicators.
Detailed steps for correctly installing and leveling the outriggers.
Procedure to test the machine's safety interlock systems.
Instructions for loading, securing, and transporting the UL-25, 32, and 40 models.
Procedures for tilting the machine back for passage through doorways.
Schedule and procedures for regular visual and operational checks.
Guidelines for lubricating chains, casters, and screw jacks.
Procedures for inspecting, cleaning, and charging the battery.
How to check and adjust the hydraulic system relief valve.
Step-by-step instructions for disassembling the mast assembly.
Instructions for replacing seals in the lift cylinder assembly.
Steps to clean the orifice valve in the cylinder assembly.
Recommended torque values for hydraulic components and fasteners.
Diagrams illustrating the electrical systems for AC and DC models.
Diagram detailing the hydraulic system of the lift.
Lists all components for the final assembled unit.
Details the core components and assemblies of the lift.
Parts list and diagram for the loader attachment.
Components for the second stage of the mast assembly.
Components and diagrams for the lift cylinder assembly.
Parts list and diagram for the UL-25 platform assembly.
Components and diagrams for the outrigger system.
Components and diagrams for the tilt back mechanism.