Page 19
LPX SEED TREATER
See pages 20 and 21 for steps
10 - 15 for LPX Manual Treaters
See pages 22 through 25 for steps
10 - 20 for LPX Automated Treaters
4. Remove any boxes and cords from the drum of the treater.
5. Install the four provided legs and set up on a level surface, preferably concrete.
When all four legs are mounted in the same pin hole, the seed treater has a slight
slope to allow seed to travel through the machine. The pin holes are approximately
2” apart.
If more slope is desired, the rear legs can be dropped an additional
pin hole.
Si plus la pente est souhaitée, les pattes arrière peuvent être d
éposés un trou de broche supplémentaire.
6. Anchor the seed treater in position to prevent the machine from moving during
operation.
7. Inspect machine thoroughly for screws, bolts, fittings, etc. which may have come
loose during shipping.
8. The pump stand(s) should be placed on level ground close to the seed treater.
9. Attach the chemical tubing from the pump stand(s) to the atomizer plumbing on the
seed treater (right). Additional tubing can be added or removed to accommodate
your set-up.
LPX MANUAL AND AUTOMATED TREATER SET - UP
NOTICE
AVIS