EasyManua.ls Logo

Vacon optbj - Page 14

Vacon optbj
47 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
vacon • 14 Installation of OPTBJ board
Local contacts: https://www.danfoss.com/en/contact-us/contacts-list/
5
Unless already done for the other control cables,
cut free the opening on the AC drive cover for the
OPTBJ cable (protection class IP21).
NOTE: Cut the opening on the side of the slot E!
6
Remount the AC drive cover and run the cable as
shown in picture.
NOTE: When planning the cable runs, remember
to keep the distance between OPTBJ cables and
the motor cable at a minimum of 30 cm. It is rec-
ommended to route the OPTBJ cables away from
the power cables as shown in the picture.
11576_00

Related product manuals