Operating and Installation Manual for uniSTOR, auroSTOR, geoSTOR Cylinders 0020080043_00 10
Remove the top pad and the cardboard sleeve carton.
Pull the cylinder on the bottom pad over the edge of
the pallet until you can break off the bottom pad at
the intended point with your foot.
Position the hand cart in front of the pallet and load
the cylinder on to it.
5.3.3 Transport without cladding
1
Fig. 5.7 Removing the top cap and covers
Remove the top cap from the cylinder.
Pull the two covers (1) off the front of the cylinder.
300l variant:
1
Fig. 5.8 Releasing the jacket
Unfasten the 6 screws (1) at the rear of the cylinder.
Take the jacket in your hand and walk once round the
tank so that the jacket rolls up.
400l and 500l variants:
1
Fig. 5.9 Releasing the jacket
5 Installation

Other manuals for Vaillant uniSTOR

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vaillant uniSTOR and is the answer not in the manual?

Vaillant uniSTOR Specifications

General IconGeneral
Maximum Operating Pressure10 bar
Capacity120L, 150L, 200L, 300L
InsulationHigh-density foam insulation
Thermal InsulationHigh-density foam insulation
Weight50 kg
Dimensions (Height x Diameter)Varies by model