Mechanical Installation
Vertiv | Liebert CRD10 | User Manual 50
3.11 Checklist for Completed Mechanical Installation
Following are the points in the checklist (refer Table 3-12) that need to be verified and confirmed to ensure
mechanical installation was implemented successfully.
Table 3-12 Mechanical Installation Checklist
Item
Result
Sufficient space is kept for maintenance, according to the user manual
The equipment is placed vertically and mounting fasteners are fastened
The pipes between the indoor unit and outdoor unit are completed. The ball valves of the indoor
unit and outdoor unit are fully opened
The wind direction of the wind-leading grill has been adjusted (if required)
Drainage pipe is connected
All pipe connectors are tight
The fasteners used for transportation have been removed
After installation, foreign materials in and around the equipment are removed (such as
shipping materials, construction materials, tools, and so on)