EasyManua.ls Logo

Vertiv Liebert MC - Operations

Vertiv Liebert MC
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
Liebert
®
MC - UM - 10019237MAN_ENG - 31.03.2022
12.2 Operations
Operation Notes
1. Disconnect the main switch from the electric power supply
2. Disconnect the Premium Controller from the main unit
Reverse the procedure from chapter 8. Installation:
8.6 Electrical Connections
3. Remove the refrigerant NOTICE
Handle the refrigerant according to regulations
about F-Gases and safety data sheet.
See 13. Regulation (EU) no. 517/2014 (F-gas)
4. Cut the piping at inlet and outlet of the unit WARNING
Before cutting the pipeline, make sure that the
circuit is completely discharged.
5. Remove the xing bolts Reverse the procedure from chapter 7.5 Unpacking
6. Move away the unit See 7.0 Handling
7. If you need to keep the unit in a storehouse for reuse See 7.3 Storage
8. If you need to scrap the unit Handle to authorized disposal company according to the
local regulations about waste disposal.

Related product manuals