* REPO Switch
Liebert PPC
Ground electrode conductor
(not by Vertiv) required per NEC
for units with transformer
Main input junction box and cable
* Low-voltage junction box
and cable
* Flexible distribution cables
per customer specifications
Building interface and alarm connections
(not by Vertiv)
* Optional devices—refer to the specification sheet for options supplied.
Main input power to unit
(not by Vertiv)
3-phase, 3-wire plus ground
for units with transformer
3-phase, 4-wire plus ground
for units without transformer