2.3MYTHOS 2
2.1.2 POSITIONING THE MACHINE
Once the packaging has been removed and the
integrity of the machine and acc
essories have been
checked, place the machine on a horizontal surface.
Position the machine on a horizontal plane at least
900 mm high from the ground.
Ensure that it is correctly levelled.
Keep at least 100 mm around the machine for prop-
er ventilation.
2.1.3 PROCEDURE OF FIRST INSTALLATION
After the positioning of the machine, to complete
the installation, it is necessary t
o:
1 Insert the coee bean container into the machine.
2 Connect the machine at the electrical mains
using the relevant socke
t.
3 Switch ON the machine.
>900 mm
100 mm
> 30°C5 >
3
4
5
6