EasyManuals Logo

Victoria Arduino MYTHOS 2 Service Manual

Victoria Arduino MYTHOS 2
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #56 background imageLoading...
Page #56 background image
9.2 MYTHOS 2
9.1 MAINTENANCE EVERY 50000 CYCLES OR 6 MONTHS
Required time 10 minutes.
The skilled technician should take all the necessary precautions relating to safety measures to insulate the
machine from the mains. Inform the manager responsible about timing and the need to operate on the
electric systems of the premises before proceeding to avoid interruptions and complete all procedures eas-
ily without further requests. Before proceeding, remove all perimeter coverings and make sure there are no
damages or leakages.
Check for any damaged wires or cabling.
Check for noisy motor.
Check for cracks on beans hopper.
Check ON/OFF switch.
Check LCD display.
Replace the clump crusher.
Bend the flaps and be sure they are really will opened with an angle of approximately 30 degrees.
Check for wear on product button selection.

Other manuals for Victoria Arduino MYTHOS 2

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Victoria Arduino MYTHOS 2 and is the answer not in the manual?

Victoria Arduino MYTHOS 2 Specifications

General IconGeneral
BrandVictoria Arduino
ModelMYTHOS 2
CategoryCoffee Grinder
LanguageEnglish