Commissioning steps
Inspection steps
Maintenance steps Page
•
1. Filling the DHW cylinder...................................................................................................... 13
• •
2. Shutting down the system
• •
3. Checking the safety valve function
• •
4. Checking the anode earth current with an anode tester.................................................. 13
• •
5. Cleaning the inside of the DHW cylinder........................................................................... 13
• •
6. Checking and replacing the protective magnesium anode.............................................. 14
• •
7. Returning the DHW cylinder to use.................................................................................... 15
• •
8. Checking the connections on the water side for tightness
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance