EasyManua.ls Logo

Viessmann Vitodens 100-W User Manual

Viessmann Vitodens 100-W
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
VIESMANN
Montage- und
Serviceanleitung
für die Fachkraft
Vitodens 100-W
Typ WB1A
Gas fired wall mounted condensing boiler
Natural gas version
Gültigkeitshinweise siehe letzte Seite
VITODENS 100-W
5581 805 2/2007 Bitte aufbewahren!

Other manuals for Viessmann Vitodens 100-W

Questions and Answers:

Viessmann Vitodens 100-W Specifications

General IconGeneral
TypeWall-mounted gas condensing boiler
InstallationWall-mounted
Fuel TypeNatural gas or LPG
Heat Exchanger MaterialStainless steel
EfficiencyUp to 98%
WarrantyUp to 10 years (depending on installation and usage)
ControlVitotronic control unit with LCD display
Dimensions700mm x 400mm x 350mm
Heating Output1.9 to 35 kW

Summary

Safety Instructions

Safety Symbols and Warnings

Explains warning symbols and provides initial safety advice.

Gas Leak and Flue Gas Procedures

Actions for gas or flue gas leaks to prevent hazards.

Safe Working Practices

Procedures for system isolation and warnings about component use.

Installation Preparation

Product Overview and Specifications

Vitodens 100-W models, features, and technical data.

Dimensions, Clearances, and Flue Systems

Physical dimensions, installation clearances, and flue system requirements.

Hydraulic and Electrical Requirements

Hydraulic circuit diagrams and electrical supply requirements.

Site Selection and Connection Prep

Boiler position, flue terminal location, and connection preparation.

Installation Procedure

Boiler Mounting and Connections

Steps for mounting boiler and making gas, heating, condensate connections.

Flue Outlet Installation

Steps for installing external wall and vertical roof flue terminals.

Electrical Connections and Commissioning

Electrical connections, testing, and boiler water temperature settings.

User Handover and Instructions

Advice on operation, controls, and maintenance for the user.

Routine Servicing

Servicing Overview and Panel Removal

Servicing recommendations and steps for front panel removal.

Burner and Electrode Maintenance

Procedures for burner removal, inspection, and electrode checks.

Component Checks and Cleaning

Heating surface cleaning and condensate drain/siphon checks.

Boiler Start-up and Final Checks

Boiler start-up after service and final checks.

Troubleshooting and Repairs

Fault Finding Procedures

Flowcharts and tables for identifying and resolving faults.

Component Repair Procedures

Steps for checking and repairing sensors and limiters.

Fuse Check

Steps to check the fuse (F1) in the control unit.

Diagrams and Parts

Wiring and Connection Diagrams

Diagrams showing electrical connections and component layouts.

Spare Parts Identification

Instructions for identifying and ordering spare parts with diagrams.

Commissioning and Service Records

Commissioning Checklist

Checklist for boiler commissioning, including system and control checks.

Service Interval Record

Section for recording service history and engineer details.

Declaration of Conformity

Product Compliance Statement

Declaration of conformity with standards and directives.

Related product manuals