EasyManua.ls Logo

Viessmann Vitogas 100 GS1 Series User Manual

Viessmann Vitogas 100 GS1 Series
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
Read and save these instructions
for future reference.
IMPORTANT
VITOGAS 100
Installation Instructions
for Use by Heating Contractor
Vitogas 100
GS1 Series
Natural gas-/propane-fired, single-stage
atmospheric cast-iron boiler
Heating input 90 to 240 MBH
26 to 70 kW
Please file in Service Binder
5167 463 v1.3 02/2011

Other manuals for Viessmann Vitogas 100 GS1 Series

Question and Answer IconNeed help?

Do you have a question about the Viessmann Vitogas 100 GS1 Series and is the answer not in the manual?

Viessmann Vitogas 100 GS1 Series Specifications

General IconGeneral
TypeGas Condensing Boiler
Fuel TypeNatural gas
Heat Exchanger MaterialStainless Steel
EfficiencyUp to 98%
Control SystemVitotronic
Operating pressureMax 3 bar

Summary

Safety

Important Regulatory and Installation Requirements

Key requirements for safe installation and regulatory compliance.

General Information

About these Installation Instructions

Guidance on understanding symbols and notations used in the manual.

Product Information

Details about the Vitogas 100, GS1 boiler and its capabilities.

Mechanical Room

Recommendations for the location and requirements of the mechanical room.

Product Installation Alternatives

Overview of different methods for installing the boiler.

Set-up

Before Set-up

Ensuring all necessary accessories are installed before boiler placement.

Minimum Clearances

Specifies required distances around the boiler for safe operation and service.

Boiler Set-up and Orientation

Guidance on positioning and leveling the boiler during installation.

Boiler Control

Boiler Control Base Installation

Steps for installing the boiler control base unit.

Connections

Electrical Connections

Instructions for wiring the boiler and its components.

Venting Connection

Guidelines for connecting the boiler's vent system to the chimney or vent.

Gas Connection and Piping

Procedures for safely connecting the gas supply line to the boiler.

Water Side Connections

Details on connecting heating water pipes to the boiler.

Safety Connections and Pressure Testing

Installing safety devices and performing hydrostatic pressure tests.

DHW Side Connections

Connecting the boiler to a domestic hot water storage tank.

Fresh Air

Combustion Air Supply

Ensuring adequate air for combustion and safe boiler operation.

Ventilation air opening

Requirements for ventilation openings for proper air exchange.

Appendix

Post-Installation Procedures

Steps to take after installation is complete.

Start-up Information

Essential steps for initial boiler start-up.

Service Binder

Instructions for filing and storing service documentation.

Technical Data

Specifications and performance data for the boiler models.

Wiring Diagrams

Schematics for electrical connections and system wiring.

Related product manuals