53
■
Central heating for all heating/cooling circuits takes
place according to a set time program. Your settings
for central heating/central cooling have no effect for
the duration of screed drying.
■
DHW heating is active.
■
In conjunction with a ventilation unit:
The maximum air flow rate is set for mechanical ven-
tilation (
).
Display in the standard menu
40°CFlow temperature
HC1
14°C
21°C
Screed drying
E
Fig. 37
Calling up screed drying for all heating/cooling cir-
cuits
1. Extended menu:
2. "Information"
3. "Heating circuit 1", "Heating circuit 2", "Heat-
ing circuit 3" or "Cooling circuit SKK"
4. "Operating program"
Heating circuit 1
Back with
Operating program:
Screed drying
Operating status:
Fixd value
HC1
Fig. 38
Remaining screed drying time
Screed drying lasts up to 32 days. The value displayed
for "Screed drying days" is the number of days
remaining.
1. Extended menu:
2. "Information"
3. "System"
System
Select with (
Central fault
Time
Date
Screed drying days 18
We 19.01.2012
14:30 o'clock
OFF
Fig. 39
Calling up information
Calling up information (cont.)
5790940