EasyManuals Logo

Villeroy & Boch A8L User Manual

Villeroy & Boch A8L
47 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #17 background imageLoading...
Page #17 background image
17
Track / Song Down
Volume
Slider
Track / Song Up
Power
Pause
Play
Mute
Bluetooth
Indicator
Audio
Settings
Track Information
Preparation and Filling
Fill the spa to its correct operating level. Be sure to open all
valves in the JetPaks and all other jets in the spa before filling to
allow as much air as possible to escape from the system during
the filling process. For details see “Filling your spa section. After
turning the power on at the main power panel, the control panel
display will go through an initializing sequence. is sequence
displays information regarding the configuration of the hot tub
control. After a few seconds, your control will display a standard
status screen with time, jet and light status, temperature status,
operation mode, etc.
Power
Press any button to turn the keypad on. After 30 minutes without
activity it will shut off.
Priming the Pumps
After initial start-up, verify that the home status screen appears
on the panel. Pumps must be primed directly after filling to
ensure correct operation of your spa. To prime the pumps press
the “Jets 1” button once to prime in low-speed. After the
pump turns on wait a few seconds and then press “Jets 1”
again to initiate high-speed operation of Pump 1. e pump has
primed when the jets are running with water flowing from the
jets. Press the Jets 1” button again to turn off Pump 1.
If your spa is equipped with a second jet pump repeat the priming
process for Pump 2 by pressing the “Jets 2” button once to
turn on low speed and then a second time to turn Pump 2 on
high. Each pump should run for 4-5 minutes at their highest
speed to complete priming. Prime each pump separately and turn
off before priming the next pump.
IMPORTANT: A pump should not be allowed to run
without priming (no water flowing out of the jets) for more than
2 minutes. Under NO circumstances should a pump be allowed
to run without priming beyond the end of the 4-5 minute
suggested priming time. Doing so may cause damage to
Comfort Line Spas

Other manuals for Villeroy & Boch A8L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Villeroy & Boch A8L and is the answer not in the manual?

Villeroy & Boch A8L Specifications

General IconGeneral
BrandVilleroy & Boch
ModelA8L
CategoryHot Tub
LanguageEnglish

Related product manuals