EasyManua.ls Logo

Vision Marathon + - Page 11

Vision Marathon +
26 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11
for battery protection.
15. Maintenance
Bypass Switch
It is Make Before Breaker type. Only an Qualified
technician is permitted to use it.
16. Input Breaker
It is a 100A/300Vac No Fuse Breaker.
17. Terminal Block
(SINGLE PHASE)
This terminal to be connected with input, output and
additional battery banks for longer backup time purpose.
Only a qualified technician is permitted to proceed the
installation.
18. Terminal Block (3-
PHASE)
This terminal to be connected with input and output. Only
a qualified technician is permitted to proceed the
installation.
19. Terminal Block (3-
PHASE)
This terminal to be connected with additional battery
banks for longer backup time purpose. Only a qualified
technician is permitted to proceed the installation.

Related product manuals