EasyManua.ls Logo

VitalConnect Platform - Start-Up Process; Shut-Down Process

VitalConnect Platform
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IFU-01, Rev. A Page 15 of 20
Start-up process:
Note: this process only applies to the end user.
1. Unpack the VitalConnect Sensor box.
2. Follow the assembly instruction provided in the VitalConnect Sensor box.
3. If the VitalConnect Sensor is assembled and placed on the torso per the IFU, physiologic data
should be automatically collected and transmitted to the server designated by the Service Provider.
Shut-down process:
1. Remove VitalConnect Sensor from torso.
2. Remove sensor module (see IFU).
3. Physiologic data collection and transmission will stop.
4. To use a new patch, follow steps 2 and 3 of the “Start-up process”.

Related product manuals