EasyManua.ls Logo

VWR Homogeniser - Transporting the Mini Bead Mill

Default Icon
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Transporting the Mini Bead Mill
The Mini Bead Mill must be shipped in its original packaging.
Before transporting please follow these steps.
Remove all tubes, and cover the unit in its plastic bag.
The tube carriage will slide back. Lift the tube
carriage to align the motor mount holes to the
holes in the base plate.
Insert screws with Allen key until you feel them
engage (It may take some adjusting to get them
aligned with the threads in the unit).
Tighten screws until completely seated.
1.
2.
1. 2.

Related product manuals