EasyManua.ls Logo

Wacker Neuson BS-4

Wacker Neuson BS-4
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Accessories
Transport roller installation 12.2
45
[en] | 07/2022 | 5100060095 | BS-4 | Operator’s Manual
Transport trolley
For easier transport on the construction site.
Transport roller
For easier transport on the construction site.
12.2 Transport roller installation
1
2
ü Machine is switched off.
1. Place the machine horizontally on a flat surface with sufficient load-
bearing capacity.
2. Secure machine against overturning.
3. Align half shells 1 in the middle.
4. Attach the half shells with four screws 2 to the guide bracket.
5. Tightening torque 1.5 Nm.
12

Related product manuals