EasyManua.ls Logo

Wacker Neuson C 48/13

Wacker Neuson C 48/13
40 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9 Operation
24
100_0201_op_0003.fm
9 Operation
9.1 Before commissioning
9.1.1 Control procedures before commissioning
Check the machine and components for damage. In the event of visible dam-
age, do not operate the machine and immediately contact a Wacker Neuson
dealer.
Ensure that loose packaging material has been removed from the machine.
Check whether the power source has the required voltage.
WARNING
Improper handling can lead to injuries or serious material damage.
Read and observe all safety instructions in this operator's manual.