EasyManuals Logo

Wacker Neuson DPU 4045H User Manual

Wacker Neuson DPU 4045H
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #27 background imageLoading...
Page #27 background image
Maintenance
T00989GB.fm 25
7.3 Hydraulic control
7.3.1 Check oil level:
1. Move centre pole into vertical position.
2. Open filler bore (26).
3. Oil level must be at mark, if necesary top up with hydraulic oil Fuchs
Renolin MR 520.
4. Close filler bore (26).
7.3.2 Venting hydraulic control:
1. Remove apron (28) by undoing the screws (29).
2. Move centre pole into vertical position, move shift lever (6) right into
the reverse position, open filler bore (26).
3. Loosen connecting screw (27).
4. Slowly push the shift lever (6) into forward motion direction until
hydraulic oil emerges bubblefree at the connection screw.
5. Tighten connecting screw (27), mount apron (28).
6. If necessary, top up with Fuchs Renolin MR 520, seal filler bore (26).

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson DPU 4045H and is the answer not in the manual?

Wacker Neuson DPU 4045H Specifications

General IconGeneral
BrandWacker Neuson
ModelDPU 4045H
CategoryPower Tool
LanguageEnglish

Related product manuals