EasyManua.ls Logo

Wacker Neuson EH 25

Wacker Neuson EH 25
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8 Transport
25
8Transport
Performing preparations
1. Pull the plug from the plug receptacle.
2. Let machine cool off.
3. Remove tool.
4. Wind up the power cable.
Transporting the machine
5. Lift machine with the supplementary handle.
6. Place the machine on or into a suitable transport vehicle.
7. Secure the machine against falling over and down or sliding.
Note: Wacker Neuson recommends to use the truck for the transport on the
construction site, refer to chapter Accessories.
WARNING
Improper handling can result in injury or serious material damage.
f Read and follow all safety information of this operator's manual, see chapter
Safety.

Related product manuals