EasyManuals Logo

Wacker Neuson EH 25 User Manual

Wacker Neuson EH 25
54 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #32 background imageLoading...
Page #32 background image
10 Maintenance
32
10.2 Maintenance schedule
10.3 Maintenance work
Task Daily
before
operation
Every
20 hrs.
Monthly
Check power cable for perfect
condition – if power cable is
defective, have it replaced. *
* Have these tasks carried out by the service department of your Wacker
Neuson contact person.
Visual inspection of all parts
for damage.
Clean the machine.
Ventilation slots.
Check the tool end and
cutting edge – if required,
sharpen, reforge or replace
(have it replaced).
Lubricate the machine.
Check tool holder for wear –
have it changed, if
necessary. *
WARNING
Electrical voltage.
Injuries from electrocution.
f Remove the plug from the plug receptacle before all work on the machine.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson EH 25 and is the answer not in the manual?

Wacker Neuson EH 25 Specifications

General IconGeneral
BrandWacker Neuson
ModelEH 25
CategoryPower Tool
LanguageEnglish

Related product manuals