EasyManua.ls Logo

Wacker Neuson PT 2

Wacker Neuson PT 2
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PT 2 / PT 2A / PT 2H Operation
wc_tx001837gb.fm 31
4.14 Emergency Shutdown Procedure
If a breakdown/accident occurs while the machine is operating, follow
the procedure below.
4.14.1 Stop the engine.
4.14.2 Turn off the fuel supply.
4.14.3 Remove any obstructions.
4.14.4 Unkink the hoses.
4.14.5 Allow the machine to cool.
4.14.6 Contact the rental yard or machine owner.

Related product manuals