EasyManua.ls Logo

Wacker Neuson Telehandler TH412 - Page 187

Wacker Neuson Telehandler TH412
362 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation 5
BA TH412 * 06/2017 * 4512_5-11_Arbeitsbetrieb_en.fm
5-61
Working with the lightweight material/earth bucket
Loading work
In order to pick up loose material, lower the lightweight
material/earth bucket parallel to the ground. Travel into
the material. Pay attention to the travel speed.
Raise the loader unit slightly to apply some load to the
front axle of the machine. Wheel spin can also be reduced
manually by inching. Tilt in the lightweight material/earth
bucket as it is filled. Travel to the unloading position with
the full lightweight material/earth bucket.
Fig. 84
Fig. 85

Table of Contents

Related product manuals