Operation 5
BA TH412 * 06/2017 * 4512_5-13_2_Opt_Hydr_en.fm
5-89
Operate additional hydraulic connections on the mast (4th control circuit)
• Move the rocker switch 47 to "position 0".
➥ The standard hydraulic connections are in
operation.
• Move the rocker switch 47 to "position I."
➥ The additional hydraulic connections are in
operation.
If the additional hydraulic connections are switched on:
• Move control lever 6 toward (L):
➥ The rear connection is the pressure side, the front
connection is the return.
• Move control lever 6 toward (R):
➥ The front connection is the pressure side, the rear
connection is the return.