EasyManua.ls Logo

WAGNER PM500 - Version 01;2013 Order Number Doc

WAGNER PM500
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
B_04208
OPERATING MANUAL
VERSION 01/2013 ORDER NUMBER DOC 2335747
The grounding connection is mandatory with PM500 pumps.
Procedure:
1. Remove the crimp connection delivered with the pump.
2. Crimp the grounding cable on the terminal and screw it back onto the pumps foot.
3. Ground the material/paint container to a local ground connection.
4. Ground the other parts of the system to a local ground connection.

Table of Contents

Related product manuals