EasyManua.ls Logo

WAGNER PM500 - 9 Maintenance

WAGNER PM500
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
35
OPERATING MANUAL
VERSION 01/2013 ORDER NUMBER DOC 2335747
9 MAINTENANCE
1. Check and clean the delivery and suction  lters daily or as necessary.
2. Carry out each decommissioning as explained in Chapter 7.2.
3. As necessary, check and replace hoses, pipes, and connections daily.
In accordance with the guideline for liquid emitters (ZH 1/406 and BGR 500 Part 2
Chapter 2.36):
- The liquid emitters should be checked by an expert (e.g. Wagner service technician)
for their safe working conditions as required and at least every 12 months.
- For shut down devices, the examination can be suspended until the next start-up.
Incorrect maintenance/repair!
Danger to life and equipment damage.
Only a WAGNER service center or a suitably trained person may
carry out repairs and replace parts.
Only repair and replace parts that are listed in the "Spare Parts
Catalogue" chapter and that are assigned to the device.
Before all work on the device and in the event of work
interruptions:
- Disconnect the control unit from the mains.
- Relieve the pressure from the spray gun and device.
- Secure the spray gun against actuation.
Observe the operating and service instructions at all times when
carrying out work.
WARNING

Table of Contents

Related product manuals