EasyManua.ls Logo

WAGNER SPRINT XE

WAGNER SPRINT XE
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
51
OPERATING MANUAL
VERSION 05/2017 ORDER NUMBER DOC 2354920
SPRINT XE
Prior to maintenance
Flush and clean the system. Chapter 8.1.2.
After maintenance
Carry out safety checks in accordance with Chapter 8.2.3.
8.2.3 SAFETY CHECKS
8.2.3.1 GROUNDING CHECK
Daily: Before starting work, carry out a visual inspection to ensure that the system is grounded.
8.2.4 MAINTENANCE PROCEDURES
The maintenance intervals should be adapted by the operator depending on the level of
use and if necessary the level of soiling.
If in doubt, we recommend contacting WAGNER's specialist personnel.
Maintenance work Time stamp
per shift weekly
Blow out gun and check for sintering
Check gun settings
Check gun discharge pressure
Blow out powder hoses
Check grounding
Check compressed air quality
Check gun voltage
Check powder hoses for bends and sintering

Table of Contents

Other manuals for WAGNER SPRINT XE

Related product manuals