EasyManua.ls Logo

Wasp CLAY - Unpackaging

Wasp CLAY
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Transport and handling
21
3
© WASP S.r.l.
3.2. Unpacking
ENVIRONMENTAL NOTE:
Once the packaging has been removed from the machine it is recommended to keep it for any requests
for assistance from the Manufacturer.
The machine will be delivered in a horizontally oriented wooden box.
After removing the machine from the case, you must assemble first the basement and then join the vertical pipe .
NOTE:
To perform this procedure it is required the presence of two operators.
Together they will take care of lifting and guiding the holes of the main body through the pipe.
Ensure there are Igus bearings in place into the holes and the thrust bearing seated between the
machine and basement ring.