4.12. Installation and Operational Checkout
Installation and Operational Checkout
Main DVS Auxiliary
#1
Auxiliary
#2
Auxiliary
#3
Serial #
_ _ _ _ _
Serial #
_ _ _ _ _
Serial #
_ _ _ _ _
Serial #
_ _ _ _ _
THE UTILITY CONNECTIONS ARE PROPERLY INSTALLED WITH ALL THE FASTENERS TIGHTENED TO THE
SPECIFIED TORQUE.
ALL DC BUS CONNECTIONS ARE PROPERLY INSTALLED WITH ALL THE FASTENERS TIGHTENED TO THE
SPECIFIED TORQUE.
ALL SECONDARY POWER STATIONS ARE CONNECTED TO THE DVS PER THE GSE INSTALLATION
GUIDE INSTRUCTIONS.
ALL COMMUNICATION AND POWER WIRING IS PROPERLY CONNECTED ON THE UPPER SHELF.
ALL HIGH-CURRENT CABLES IN THE CHARGING PATH ARE SECURELY FASTENED.
ALL WASHERS AND SCREWS ARE PROPERLY INSTALLED ON THE DOOR AND COVER.
WASHERS AND SCREWS ARE PROPERLY INSTALLED IN THE CONDUIT HUBS.
THE CAP AND SCREWS ARE PROPERLY INSTALLED ON THE SERIAL PORT CONNECTOR.
THE UNIT IS SECURELY MOUNTED.
PORT “A” CHARGES PROPERLY WHEN CONNECTED TO A VEHICLE.
PORT “B” CHARGES PROPERLY WHEN CONNECTED TO A VEHICLE.
FRONT-PANEL LEDs WORK PROPERLY.
THE DISPLAY IS FULLY OPERATIONAL.
THE LATEST APPLICATION CODE HAS BEEN LOADED.
ALL FRONT-PANEL CONTROL BUTTONS ARE FUNCTIONAL.
ALL POWER STATIONS POWER UP, AND THE NETWORK CONFIGURES CORRECTLY WHEN POWER IS APPLIED TO THE
POWER SERVER.
SYSTEM CHECKED BY NAME/SIGNATURE: / DATE:
CUSTOMER/LOCATION: / GATE: