EasyManua.ls Logo

Welch Allyn Connex - Prepare for Mounting

Welch Allyn Connex
22 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Setup Welch Allyn Connex® Integrated Wall System
Prepare for mounting
1. Slide the mounting rail bracket out of the packing material and put it aside. Do not
discard. Then flip the wall system onto its back.
2. Remove the cardboard end caps as shown and put aside for recycling.
1
Caution Do not remove the cardboard securing the handles on the left side of
the wall system at this time. The cardboard prevents damage to those
instruments during the mounting process.

Other manuals for Welch Allyn Connex

Related product manuals