EasyManuals Logo

Westerbeke 20B TWO Tehnical Manual

Westerbeke 20B TWO
99 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #60 background imageLoading...
Page #60 background image
Injection Pump Assembly
1.
I
nsert
the plunger
barrel
into the housing.
2.
Install the delivery
valve
and
valve
spring. Temporarily tighten the holder.
3.
Insert the control
rack.
4.
I
nsert
the control pinion.
Align
the matchmark
on
the rack with that
on
the pinion.
5.
Install the spring upper
seat.
6.
Insert the plunger spring.
7.
Fit the lower
seat
to the plunger. Insert the plunger into the
barrel
side.
8.
Depress
the tappet roller assembly
and
install
the stopper
pin.
9.
Tighten
the delivery holder.
Tightening torque:
3.5
-
3.9
kgm
Injection Pump Installation
Install
the
injection pump assembly
in
the
reverse
order
of
removal.
CAUTION
When
installing the plunger
barrel,
engage
the
dowel pin
on
the housing side with
the
groove
in
the
barrel.
Position the plunger
so
that the part
number stamp
on
its flange
faces
the direction
opposite to the rack
side.
(Engage
the
feed
hole
with the plunger
lead.)
After installation, check
for proper injection timing.
Westerbeke Engines
58
Stamp
Rack
side
Direction
of
Installation
of
Plunger

Other manuals for Westerbeke 20B TWO

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Westerbeke 20B TWO and is the answer not in the manual?

Westerbeke 20B TWO Specifications

General IconGeneral
BrandWesterbeke
Model20B TWO
CategoryEngine
LanguageEnglish

Related product manuals