EasyManua.ls Logo

Wilbar Optimum OVAL - Step 09: Fill Trench with Concrete

Default Icon
68 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30
09
SECTION 1 - OPTIMUM OVAL ABOVE GROUND POOL
FILL TRENCH WITH CONCRETE
STEP
9.1 Check pool is level and square before pouring
concrete.
9.2 Fill trench until it reaches the top of the A-Frame foot
inside the pool and the top of the channel outside
the pool.
Do not ll with water until concrete is set.
9.1
Concrete to ll
trench inside
wall up to pool
oor
Concrete to ll
trench outside
wall to cover
channel

Related product manuals